HumaNesting - Days 8 to 12
Day 8: Using Horses as an organic tool
Meeting with Zuki the Engineer |
Fixing the foundation woods with steel cable bindings |
Current Binding System |
Wished-for Binding System - "Steel Ribbon" |
Cleaning the branches |
Making ropes for the cable binding |
Day 9: Starting the Roof Construction
Old Aerial Photo - Our Site is well-developed (upper right side, between the green and brown fields) |
Picking up long fresh branches for the top construction |
Wooden milk |
Days 10-11: Finishing Roof Construction part 1 (woods)
Day 12: Starting "The Fives"
Eucalyptus Texture Collection
Cleaning 4-5 cm diameter branches to be used as a base for the weaving |
Next time: Steel cable construction for the roof
Start weaving!
6/16/2013
HumaNesting - Residue / Construction Continued
The truck
Never let a truck go under a bridge, then you can't open it.
Foundation and Column Construction
Horses are eating up our materials
Foundation adjusted with thick and dry logs