6/10/2013

HumaNesting Construction - Days 4-5-6 (or: how to make a truck driver angry)

Day 4: Moving Pruned Branches to Final Construction Site
Old-New Location
View from the Mountain

Bugger is bugging the branches into the truck

This is how you move a truck full of trees under a main highway (and partly break the truck's door)

Unloading the truck on site

Summary- Day 4
1 flat tire
1 angry truck driver
1 partly broken truck door

Days 5+6: Making a Big Pit


Summary- Day 5
80-cm deep hole
~100 buckets of soil






 Link: 360-Degrees Panorama view from the Pit

First Test 
No Oil :-(
The Warrior's Rest

 Summary- Day 6
120-cm deep hole
150-200 buckets of soil
1 new logo

6/08/2013

A Day With Asee Group

Locating plant of common reeds which has maximum length of reeds (~ 6 meters).
 
Cutting or uprooting the longest reeds.
 
 Cleaning the reeds from Foliage.
 
Loading reeds on the car and drive it to the construction site.
 
 
Placing  the clean reeds in between the trees for bending.
 
 
 
 Improved form Created by a bow with overlap in order to get a stable construction.
 
 
 Create 12 foundation pits and Laying the 8 bows in them.
 
Started weaving between the arches.
 
 
Number of Cattle Egret Sunbathing with a single Hooded Crow.
 
 
Snake sheds its skin which remains at the entrance to his cave, it form remains complete.