6/05/2013
6/02/2013
ASEE WORKING
Method
One: Preparing connections from dry reed (sock).
Thread three connectors on each
pair of reed which are intended to produce a single bow.
Method
two: coiling a thin rope around pair of reed which are intended to produce a
single bow.
Stack of bows in the open
position. Both connection methods.
Bows
which are connected by a rope. It was bending for a week, kept their arc shape.
Creating
four bows, which produce two cross bows while using the first method. Using dry
reed connectors (sock).
Finding
a temporary location and analysis of the foundation ground - digging pits
20-40 cm deep for locating the bows.
Laying the bows in the foundation pits.
Cover
each hole in the ground and started weaving between the arches.
View
at the weaving from the inside.
Single
arc detail connecting to the ground.
6/01/2013
5/29/2013
HumaNesting Construcion - Day 2
A Guy on the Hill |
Desired way of transferring the woods to the construction site |
Starting collecting trees
Large, Long, Dry Woods |
Bye Bye Old Location
Hellooooo New Location
Reasons to choose the new location:
- An open, flat area, clearly visible from the bike path, the mountain, the sky and the surrounding roads (previous place was behind a 3-meter hill)
- More distant from the Ayalon river, hence possibly safer against floods
- Not on the bike path but next to it
- Better working area due to the closer shed which can be a temporary storage or shelter from the sun
- Location is in a small "No Man's Land" in the edge of the agricultural area, which is used neither for agriculture nor for anything else