6/20/2013

Completion

Completion



the final form 1-20 


 the pieces 1-20


the list of all the pieces


how to: making the pieces 1-1




























הספירה לאחור החלה

מודל ריינו.

 מעטפת
 פרט חיבור המעטפת לקונסטרוקציה




 המעטפת


 
חיבור הקשת לעמוד.
מודל ריינו

6/17/2013

Stats

Yesterday, our blog reached 50,000 pageviews. Our readers come from more than 60 countries from 5 continents. The average visitor reads 4.76 pages per visit, for 00:03:17 (3 minutes and 17 seconds).
Whoever you are and where ever you are, Thank you!  

HumaNesting - Days 8 to 12

Day 8: Using Horses as an organic tool

Meeting with Zuki the Engineer

Fixing the foundation woods with steel cable bindings 
Current Binding System
Wished-for Binding System - "Steel Ribbon"

Cleaning the branches


Making ropes for the cable binding

Day 9: Starting the Roof Construction
Old Aerial Photo - Our Site is well-developed (upper right side, between the green and brown fields) 
Picking up long fresh branches for the top construction

Wooden milk




Days 10-11: Finishing Roof Construction part 1 (woods)











Day 12: Starting "The Fives"


 Eucalyptus Texture Collection





Cleaning 4-5 cm diameter branches to be used as a base for the weaving






Next time: Steel cable construction for the roof
Start weaving!