6/17/2013

HumaNesting - Days 8 to 12

Day 8: Using Horses as an organic tool

Meeting with Zuki the Engineer

Fixing the foundation woods with steel cable bindings 
Current Binding System
Wished-for Binding System - "Steel Ribbon"

Cleaning the branches


Making ropes for the cable binding

Day 9: Starting the Roof Construction
Old Aerial Photo - Our Site is well-developed (upper right side, between the green and brown fields) 
Picking up long fresh branches for the top construction

Wooden milk




Days 10-11: Finishing Roof Construction part 1 (woods)











Day 12: Starting "The Fives"


 Eucalyptus Texture Collection





Cleaning 4-5 cm diameter branches to be used as a base for the weaving






Next time: Steel cable construction for the roof
Start weaving!