11/04/2012

HIDE & SEEK Bal Mandir - Tunnel

As an integral part of the design, and a part of the circulation in the structure, we built a tunnel using ferrocement technique, which creates a kids-only territory, playful, adventurous and flooded with color.  
Digging foundation for the tunnel and building a supporting wall to
bind the tunnel to the compound wall 
Placing the reinforcement and the chicken mesh to the foundation
and the wall 
Shaping a mold out of mud for casting the cement
Attaching the chicken mesh to the compound wall - detail
Shaping the cement free-handed over the
reinforcement
poles and chicken mesh.
Digging out the mud
Creating halls in the cement by placing tubes in the mold for sun
beam penetration, peeping and ventilation 
Colorful china mosaic flooring
The finished tunnel

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.